School Development

PROMISE SCHOOLS DEVELOPMENT 

PAIS commenced operation in August 2016 with 63 students in the existing on-site buildings  – renovated and upgraded.

2016-2017 –    School commenced with A (Adminisration), and  B and C                                  Blocks (classrooms).                                                                                      The Music Hall (M-Block) was constructed and C-Block                                      renovated.

2017-2018 –    C-Block was further renovated and extended to create D-                                  Block.                                                                                                          An existing building was renovated to create E-Block.                                        An all-weather, multi-sports complex was built.

2018-2019 –    Promise School Mingaladon opened (August 2018) as a second                          campus of PAIS.                                                                                            At the main campus, E-Block was renovated with a second storey – to accommodate extra classrooms, a larger library and staff room, and more covered  play space with a play gym.                                                                                   Administration offices expanded into the current library and staff-room spaces.

2019-2020  –   An extended play space, parking area and student pickup zone are under construction. Plans for a purpose-built Science facility are on the drawing board.